If you're a keen amateur builder, you'll know that working with concrete can be a bit of a guessing game

In this guide we aim to clear up some of the confusion around concrete curing time and help you understand the factors that can affect it. 

The science behind concrete setting

Before we explore the factors affecting concrete curing time, it's important to understand the science behind the process. 


https://www.concrete2you.com/types-of-concrete is a mixture of cement, sand, aggregate and water. When these ingredients combine, a chemical reaction called hydration occurs. This reaction causes the concrete to harden over time. The term ‘drying’ is actually a misnomer, as the process is more about the concrete curing and hardening rather than simply losing moisture.

 

What can affect curing time?

There are several factors that can influence how long it takes for concrete to set and dry. Here are some of the key elements.

 

Mix proportions


The ratio of cement, sand, aggregate and water in the concrete mix plays a crucial role in determining the consistency of the concrete the curing time. A mix with a higher cement content will generally set and dry faster than one with a lower cement content.

 

Water-to-cement ratio

The amount of water used in the mix is another critical factor. A higher water-to-cement ratio will result in a longer curing time, while a lower ratio will speed up the process. However, it's important to strike the right balance, as too little water can make the concrete difficult to work with and may compromise its strength.

 

Additives

Many concrete mixes include additives that can either speed up or slow down the curing process. For example, accelerators can help the concrete set faster, while retarders give you more time to work with the mix before it hardens.

 

The effect of weather

Weather conditions can also have a significant impact on concrete curing time. Here's how different conditions can affect the process.

 

Temperature
Concrete cures best at ambient temperatures between 10°C and 30°C. If the temperature is too low, the curing process can slow down, while excessively high temperatures can cause the concrete to set too quickly, leading to cracking.

 

Humidity
High humidity levels can extend the curing time, as the moisture in the air prevents the concrete from losing water. On the other hand, low humidity can cause the concrete to dry out too fast, again leading to cracking.

 

Wind
Windy conditions can also impact the curing process. Strong winds can cause the surface of the concrete to dry out too quickly, which may result in surface cracks.

Finished, Uncured Concrete
Cured Concrete

Protecting freshly-laid concrete

To ensure your concrete cures properly and achieves its full strength, it's essential to lay the concrete in the right way and protect it during the curing process. Here are some tips for safeguarding your freshly-laid concrete.

Covering


Cover the concrete with a plastic sheet or a curing blanket to help retain moisture and maintain a consistent temperature. This is especially important if you're working in hot, sunny or windy conditions. It is important to ensure that any covering is secured in place and does not create a “wind tunnel effect” which can potentially accelerate moisture loss.

Moisture control

Keep the concrete moist by periodically misting it with water, especially during the first few days of the curing process. This will help prevent the concrete from drying out and cracking.

Temperature Control

If you're working in cold weather, consider using insulating blankets or heated enclosures to maintain the ideal temperature for curing.

Avoid traffic

Keep people and vehicles off the concrete for at least the first 24 hours, and avoid placing heavy loads on the surface until the concrete has reached its full strength. This will help prevent cracks and other damage during the curing process.

 

Common Myths about concrete drying

Although understanding the technical aspects of concrete drying is crucial, it's equally important to dispel common myths and misconceptions that often lead to mistakes in concrete handling.

Myth 1: Concrete Dries Faster in Hot Conditions.

Whilst heat accelerates the curing process, excessive heat leads to rapid water evaporation, causing cracks and structural weaknesses. It's a delicate balance that requires maintaining optimal moisture levels for concrete to gain strength.

Myth 2: Concrete Can't Be Poured in Cold Weather. 

Whilst cold weather poses challenges for concrete curing, it doesn't make it impossible. With proper precautions like using hot water in the mix, protecting the area from the elements, or using additives to accelerate setting time, concrete can indeed be poured and set in colder temperatures.

Myth 3: Dry Concrete is Strong Concrete.

Some assume that the drier the concrete mix, the stronger the concrete will be. In reality, concrete needs the right amount of water to ensure the chemical reaction (hydration) that solidifies the mixture. Too dry, and it may be strong but not durable.

 

So, just how long does concrete take to dry?

The answer to this question can vary depending on the factors we've discussed, but as a general rule of thumb, you can expect the following concrete curing times:

 

Initial set

The concrete will typically start to harden within two to four hours of being poured. At this stage, it should be firm enough to hold its shape but still pliable enough to be worked on if needed.

 

Final set

After about 24 hours, the concrete will have reached its final set. This means it's no longer workable and has developed enough strength to support light foot traffic. However, it's still not strong enough for heavy loads.

 

Full strength

Concrete reaches its design strength after about 28 days of curing. At this point, it's safe to place heavy loads on the surface, and the curing process is considered complete.


Keep in mind that these are general guidelines, and the actual curing time for your specific project may differ based on the factors covered earlier. Always consult the manufacturer's instructions for the concrete mix you're using and consider the unique conditions of your project when estimating curing times.

 

And finally

Understanding how long concrete takes to dry and the factors that can affect its curing time is essential. By taking the right precautions and considering the mix proportions, weather conditions and proper protection, you can ensure your concrete cures correctly and achieves its full strength. 


Remember, patience is key when working with concrete – giving it the time it needs to cure will result in a strong and durable surface that will last for years to come.

Finished Uncured Concrete

Our Locations

As the UK’s leading supplier of ready mix concrete, we have over 78 plants all across the UK.

Product Range

We have a range of specialist, high performance concrete products to support your project needs.

Calculator Tool

Use our simple and easy concrete calculator to get the right amount of concrete for your project.